WIRING COMPLETE TO THREE MORE BUILDINGS

With a thank you to Steiner Trenching and Kidron Electric we are happy to report that three more buildings have electrical wiring in place.  The Sauer Blacksmith Shop, the Bixler House and the storage facility all have powered electrical panels installed.  We also have a light installed in the overflow parking lot.

Shortly, we will begin wiring the Blacksmith Shop and the Bixler House for lights and electrical outlets. We are moving closer to each building being for rent.