BIXLER HOUSE WORK CONTINUES

Bixler interiorWork continues on the 1832 Sommer/Bixler House. Windows on the first floor have been installed and doorways famed. Framing has been added to the rest of the first floor to accomodate electric, insulation and dry wall, but leaving exposed part of each of the original beams.  We expect flooring for the second floor to arrive by mid-June so that we can continue on to frame the second floor.