The Tuesday work group is concentrating on finishing the Bixler House this fall. We are currently adding insulation and have finished the first floor so far. Next week we will start on the second floor and attic. We will then have an inspection and will be able to proceed to drywall. The only thing left after that will be the HVAC to be installed by Robinson Heating.